Water treatment plants

Tehran’s Sixth Water Treatment Plant Project

The Largest Treatment Plant in the Middle East with 2 modules, 7.5m3/s, a total of 15m3/s

3 Tanks with Capacities of 15,000m3, 5,000m3 and 17,000m3

Implementation of the Completion Operations of the Construction of the Sari Water Treatment Plant

Transferring Water from the Shahid Rajaei Dam to the Treatment Plant with a 900mm diameter Pipe with a length of 25km

Design, Construction and Completion of Buildings, Structures and Equipment – Installation of Telemetry System from Shahid Rajaei Dam to Kermani Bagh Reservoir

Supply and Installation of Water Treatment Equipment in Beshagard City

The Water Transmission Line from Jegin Dam to Beshagard City is about 23km long – Implementation of Flowmeter Ponds, Control Valves, Butterfly Valves, etc.

Construction of the Pre-sedimentation Unit and Side Ponds of the Garmsar Water Treatment Plant

Implementation of Flash Mixer Unit, Flocculation and Sedimentation – Construction of Disconnection and Connection Basin and Input and Output Control

Construction of the Third Module of Water Treatment Plant Number two in Karaj

Upgrading the Filtration Capacity of the Treatment Plant to 1800 L/s
50m Piping with 400 and 600 diameter Concrete Pipe
381 m Piping with Steel Pipe with diameters of 350, 500, 700 and 1000mm
256m Piping with 160, 200 and 800mm diameter Polyethylene Sewer Pipes
Complete Implementation of Excavation and Embankment Operations and Landscaping

Construction of a 2000m3 Concrete Tank

Supervising the completion of the construction of the new Qom water treatment plant

Implementation of two modules of Qom Water Treatment Plant including ancillary and process buildings and procurement, transportation and installation of electromechanical equipment

Supervising the supply of a complete ozonation system of 10 kg/h with air inlet in the water treatment plant of Sistan villages

Ozone Generator Building Equipment

Supervising the reconstruction and restoration of structures and processes of Zahak water treatment plant

Modification and Reconstruction of Reinforced Concrete Structures of Walls of Clear Ponds
Establishment of the necessary site and structure for the establishment of chlorofric reservoirs
Restoration and modification of filtration system

Preparation, installation and commissioning of electromechanical equipment of the third module of Karaj Water Treatment Plant No. 2

Implementation of ancillary and process units and procurement, transportation and installation of electromechanical equipment

Carrying out Part of the Remaining Operations of the First Phase of Tehran’s Sixth Water Treatment Plant

Implementation of the Western Flood Canal and Implementation of 3 Units Lagoon
Construction of Office Building and Conference Room
Complete Implementation of Sludge Recovery and Disposal System with a Capacity of 2.5m3/s