Wastewater treatment plants

Parand Wastewater Treatment Plant Project

Treatment plant in two modules – The A2O process with the ability to remove nitrogen and phosphorus and anaerobic digestion of sludge – covers more than 350,000 people – with a total capacity of 60.000 m3/d

Implementation of the Completion of the Sewage Treatment Plant in Pishwa City

Design, Supply and Installation of Sludge Dewatering Equipment, Laboratory Equipment – Completion of the Remaining Works of Peshwa Sew Wastewater Treatment Plant

Construction of the SBR Structure of the Second Module of the Wastewater Treatment Plant in the North of Kish Island

Implementation of SBR Reactor Concrete Structures – Preparation and Installation of Pipes and Fittings Buried in Concrete

Construction of the Building and the Installation and Electro-mechanical Equipment of the Completion Plan of the Wastewater Sludge Treatment Plant of Babol City.

Treatment Plant in two Modules with four Flow Lines – MLE Activated Sludge System – for a Population of 385,678 People

Supply of Equipment and Construction of the First Module of Wastewater Treatment Plant No. 2, Shahr Jadid Pardis

Implementation of Ancillary and Process Buildings and Procurement, Transportation and Installation of Electro-mechanical Equipment

Execution Operations of Feasibility Studies and Detail Design of the Wastewater Treatment Plant of Sepid Farab Kavir Steel Production Complex.
Implementation of Landscaping, Office Building, Laboratory and Chemical Warehouse and Diesel Generator Room
Implementation of Balancing Pool and Implementation of all Process Tanks
Installation and Testing of Electro-mechanical Equipment in the First Phase
The Wastewater Inlet Basin along with the Transfer Path

Artavail Diamond Iron and Steel complex’s Special Refinery

Construction of a Treatment Plant – the flow rate of the Incoming Effluent to the Treatment Plant is equal to 100L/s and the flow rate of Purified Water is 50L/s

Engineering Services, Supply of Materials and Equipment and Treatment of Wastewater House No. 2, Pardis City
Implementation of Internal Electricity Building No. 2 – A, B and C Division Ponds
Primary and Secondary Telescopic Valve Tank
Primary and Secondary Sedimentation Tank Structure
Access Road to the Treatment Plant Site

Implementation of Sewage Treatment Plant of Sepidan City (DBO)

Implementation of Sepidan City Wastewater Treatment Plant by DBO Method

Construction of Wastewater treatment plant module in the north of Kish Island with a capacity of 10,000m3

Construction of a sanitary Wastewater treatment plant using the SBR method with advanced equipment technology with a capacity of 10,000m3/d