135,000m3 concreating – 200,000m3 excavation
The Annual Water Inflow of the Divaresh River = 35m3 – the Height of the Dam = 45m
The Length of the Crest = 200m – the Standard Width of the Foundation of the Dam = 40m
135,000m3 concreating – 200,000m3 excavation
The Annual Water Inflow of the Divaresh River = 35m3 – the Height of the Dam = 45m
The Length of the Crest = 200m – the Standard Width of the Foundation of the Dam = 40m
Supply of sheets, fabrications, coatings and transportation of steel pipes
First Part of the Tunnel = 11km – Second Part = 10km – Access Tunnel = 1/5km – The diameter of the Tunnels = 4.75m
Underground Pumping Station with dimensions = 110 x 18 x 18m – Pumping Head = 280m
Pumping Flow = 2m3/s
Connecting the Catchment Structure below the level of Zayandeh Rood Lake to the Pumping Station
Implementation of Internal Electricity Building No. 2 – A, B and C Division Ponds
Primary and Secondary Telescopic Valve Tank
Primary and Secondary Sedimentation Tank Structure
Access Road to the Treatment Plant Site
Supply of sheets, fabrications, coatings and transportation of steel pipes
Construction of a 1000m3 tank for pumping station number one and the second part of Royder water transmission line.
Piping with hard PVC pipe with a diameter of 630mm and a total length of 21000m
Piping with welded steel pipe of 200, 700 and 800mm in length of 33497m – construction of valve chambers, installation of valves, accessories and connections of water transmission lines
Construction of pumping station buildings – Construction of a buried M32000 underground concrete tank unit – Procurement, transportation and installation of electromechanical equipment of pumping stations and tanks – Procurement and installation of control equipment by CCTV cameras
850km of Piping with Pipes with a diameter of 315mm to 63mm
Construction of 15 Pumping Stations and 15 Water Reservoirs from 250m3 to 1000m3
Installation of 60km of Rural Pipe with 900mm diameter Steel Pipe and 2 Pumping Stations
Installation of 100km of Steel Pipes with a diameter of 600mm and 315mm and a Water Reservoir with a Capacity of 2000m3
Construction of 12 km of ductile iron pipe with a diameter of 250 to 800 mm and 14 km of water transmission lines to the city’s storage tanks
Construction of a high tank unit of about 1200m3, water pressure supply – construction of 4 tank milking units – tank electricity facilities and yard facilities – creation of landscaping
The Largest Treatment Plant in the Middle East with 2 modules, 7.5m3/s, a total of 15m3/s
3 Tanks with Capacities of 15,000m3, 5,000m3 and 17,000m3
Transferring Water from the Shahid Rajaei Dam to the Treatment Plant with a 900mm diameter Pipe with a length of 25km
Design, Construction and Completion of Buildings, Structures and Equipment – Installation of Telemetry System from Shahid Rajaei Dam to Kermani Bagh Reservoir
The Water Transmission Line from Jegin Dam to Beshagard City is about 23km long – Implementation of Flowmeter Ponds, Control Valves, Butterfly Valves, etc.
Implementation of Flash Mixer Unit, Flocculation and Sedimentation – Construction of Disconnection and Connection Basin and Input and Output Control
Upgrading the Filtration Capacity of the Treatment Plant to 1800 L/s
50m Piping with 400 and 600 diameter Concrete Pipe
381 m Piping with Steel Pipe with diameters of 350, 500, 700 and 1000mm
256m Piping with 160, 200 and 800mm diameter Polyethylene Sewer Pipes
Complete Implementation of Excavation and Embankment Operations and Landscaping
Construction of a 2000m3 Concrete Tank
Implementation of two modules of Qom Water Treatment Plant including ancillary and process buildings and procurement, transportation and installation of electromechanical equipment
Ozone Generator Building Equipment
Modification and Reconstruction of Reinforced Concrete Structures of Walls of Clear Ponds
Establishment of the necessary site and structure for the establishment of chlorofric reservoirs
Restoration and modification of filtration system
Implementation of ancillary and process units and procurement, transportation and installation of electromechanical equipment
Implementation of the Western Flood Canal and Implementation of 3 Units Lagoon
Construction of Office Building and Conference Room
Complete Implementation of Sludge Recovery and Disposal System with a Capacity of 2.5m3/s
Construction of 15 Wastewater pumping stations along with electrical and mechanical equipment – completion and improvement of 10 pumping stations – Pipe laying with fiberglass, polyethylene and PVC pipes of different sizes – Micro-tunneling operation with polymer concrete pipes of 1000, 1200 and 1400mm – Piling operations
Construction of two Pumping Stations with a Capacity of 80lit/s and 260lit/s – 24km of Ductile Steel Pipelines, size 300mm to 800mm
Construction of 6 Tanks each with a volume of 23000m3
Piping with UPVC sewer pipes of different sizes with a total length of 11469m – installation of a 200mm pressurized line with a length of 180m – construction of about 184 prefabricated concrete abutments – simultaneous implementation of the network and 610 sewer branch lines
Preparation and implementation of piping with UPVC sewage pipe and polyethylene pipe of different diameters
Preparation and Implementation of 59870m Wastewater Polyethylene Pipe with a diameter of 200 to 800mm – Construction of about 70 Brick Manholes, 276 In-situ Concrete Manholes and 918 Polyethylene Manholes – 900 Sewer Branch Lines
11862m piping of 160, 315, 400 and 500mm diameter – Preparation and execution of 650m long polyethylene 500 piping under network pressure – Construction of a 60*60 pond for household branches
Pipe laying with 200, 500, 630 and 800mm diameter polyethylene pipes and a total length of 8125m. Construction of 45 brick manholes – 93 prefabricated concrete manholes – 29 in situ concrete manholes.
8125m Pipe laying with Wastewater Polyethylene Pipes with diameters of 200, 500, 630 and 800mm – Construction of 45 Brick Manholes – 93 Prefabricated Concrete Manholes – 29 In-situ Concrete Manholes.
Laying pipes with polyethylene sewage pipes with a diameter of 1400 mm in the form of an open trench with concrete casing with a length of 238 m, piping with a polyethylene sewage pipe with a diameter of 1200 mm, in the form of a tunnel with a length of 429 m, carrying out piping operations with a concrete casing of 1800 mm and passing a pipe of 1200 mm through it with a length of 100 m, construction of 10 concrete embankments in situ.
Parand Wastewater Treatment Plant Project
Treatment plant in two modules – The A2O process with the ability to remove nitrogen and phosphorus and anaerobic digestion of sludge – covers more than 350,000 people – with a total capacity of 60.000 m3/d
Implementation of the Completion of the Sewage Treatment Plant in Pishwa City
Design, Supply and Installation of Sludge Dewatering Equipment, Laboratory Equipment – Completion of the Remaining Works of Peshwa Sew Wastewater Treatment Plant
Construction of the SBR Structure of the Second Module of the Wastewater Treatment Plant in the North of Kish Island
Implementation of SBR Reactor Concrete Structures – Preparation and Installation of Pipes and Fittings Buried in Concrete
Construction of the Building and the Installation and Electro-mechanical Equipment of the Completion Plan of the Wastewater Sludge Treatment Plant of Babol City.
Treatment Plant in two Modules with four Flow Lines – MLE Activated Sludge System – for a Population of 385,678 People
Supply of Equipment and Construction of the First Module of Wastewater Treatment Plant No. 2, Shahr Jadid Pardis
Implementation of Ancillary and Process Buildings and Procurement, Transportation and Installation of Electro-mechanical Equipment
Artavail Diamond Iron and Steel complex’s Special Refinery
Construction of a Treatment Plant – the flow rate of the Incoming Effluent to the Treatment Plant is equal to 100L/s and the flow rate of Purified Water is 50L/s
Implementation of Sewage Treatment Plant of Sepidan City (DBO)
Implementation of Sepidan City Wastewater Treatment Plant by DBO Method
Construction of Wastewater treatment plant module in the north of Kish Island with a capacity of 10,000m3
Construction of a sanitary Wastewater treatment plant using the SBR method with advanced equipment technology with a capacity of 10,000m3/d
Ray Ab Consulting Engineers specializes in providing comprehensive solutions for water management. This includes the design & implementation of systems aimed at effectively supplying, distributing, & conserving water resources. Our company focuses on sustainable practices to ensure efficient use of water & integrates modern technologies to enhance water quality & supply reliability.
Water Division
Ray Ab Consulting Engineers is one of the Leading Companies in the field of Feasibility and Detail Design of Water Projects and Water Department has Successfully Designed more than 400 Projects in Transmission Lines, Pumping Stations, Urban, Rural and Industrial Water Treatment Plants and Distribution Networks, Water Supply and Desalination Projects with the Highest Quality.
137km Steel Pipe with a diameter of 1200mm to 1600mm & Pipe thickness from 11mm to 15mm
Treatment Plant with a Treatment Capacity of 3000 liters -Two Pumping Stations in two stages, each 3m3/s.
The Largest Treatment Plant in the Middle East with 2 modules, 7.5m3/s, a total of 15m3/s
3 Tanks with Capacities of 15,000m3, 5,000m3 and 17,000m3
Treatment plant in four modules with eight flow lines – The A2O process with the ability to remove nitrogen and phosphorus and anaerobic digestion of sludge – covers more than 700,000 people – with a total capacity of 114,800 m3/d-Construction of two Pumping Stations with a Capacity of 80lit/s and 260lit/s – 24km of Ductile Steel Pipelines, size 300mm to 800mm
Construction of 6 Tanks each with a volume of 23000m3