The project of construction, procurement, transportation and installation of electrical and mechanical equipment for 15 Wastewater pumping stations and completion of electrical and mechanical equipment for 10 stations, along with the implementation of a part of the main collection lines and Wastewater collectors in the east and west of Ahvaz and Karun.

Construction of 15 Wastewater pumping stations along with electrical and mechanical equipment – completion and improvement of 10 pumping stations – Pipe laying with fiberglass, polyethylene and PVC pipes of different sizes – Micro-tunneling operation with polymer concrete pipes of 1000, 1200 and 1400mm – Piling operations

Construction of pumping station and transmission lines of distribution tanks and distribution network and distribution network of Parand green space wastewater

Construction of two Pumping Stations with a Capacity of 80lit/s and 260lit/s – 24km of Ductile Steel Pipelines, size 300mm to 800mm

Construction of 6 Tanks each with a volume of 23000m3

Implementation of the piping of the Wastewater collection network in scattered parts of Kish Island

Piping with UPVC sewer pipes of different sizes with a total length of 11469m – installation of a 200mm pressurized line with a length of 180m – construction of about 184 prefabricated concrete abutments – simultaneous implementation of the network and 610 sewer branch lines

North of Kish Wastewater Collection Network – East and West Region

Preparation and implementation of piping with UPVC sewage pipe and polyethylene pipe of different diameters

Preparation of Pipe, Transportation and Implementation of Collection Network and Transfer Line of 900 Pieces of Wastewater Branch of Safadasht Industrial Town.

Preparation and Implementation of 59870m Wastewater Polyethylene Pipe with a diameter of 200 to 800mm – Construction of about 70 Brick Manholes, 276 In-situ Concrete Manholes and 918 Polyethylene Manholes – 900 Sewer Branch Lines

Implementation of Wastewater network and branching operations in West Ahvaz

11862m piping of 160, 315, 400 and 500mm diameter – Preparation and execution of 650m long polyethylene 500 piping under network pressure – Construction of a 60*60 pond for household branches

Wastewater collection and transmission network of the main line of Fasa city

Pipe laying with 200, 500, 630 and 800mm diameter polyethylene pipes and a total length of 8125m. Construction of 45 brick manholes – 93 prefabricated concrete manholes – 29 in situ concrete manholes.

Wastewater Collection and Transmission Network of the Main Line of Fasa City

8125m Pipe laying with Wastewater Polyethylene Pipes with diameters of 200, 500, 630 and 800mm – Construction of 45 Brick Manholes – 93 Prefabricated Concrete Manholes – 29 In-situ Concrete Manholes.

Construction of the main sewage collection line of Qarchak city

Laying pipes with polyethylene sewage pipes with a diameter of 1400 mm in the form of an open trench with concrete casing with a length of 238 m, piping with a polyethylene sewage pipe with a diameter of 1200 mm, in the form of a tunnel with a length of 429 m, carrying out piping operations with a concrete casing of 1800 mm and passing a pipe of 1200 mm through it with a length of 100 m, construction of 10 concrete embankments in situ.